Constant & RubyCircuit
Hey Ruby, I’ve drafted a test plan for the new sensor kit—want to walk through it so we can avoid the classic “did we forget the power regulator” disaster?
Sure, send it over. I'll flag missing regulators and other critical points.
Here’s the test plan outline for the sensor kit:
1. **Scope & Objectives**
• Verify sensor accuracy within ±0.5 % under all operating conditions
• Confirm power consumption stays below 12 mA average
• Test communication latency < 50 ms over 10 km range
• Validate firmware resilience to OTA updates
2. **Test Items**
• Sensor module (temperature, humidity, pressure)
• Power supply (regulated 3.3 V, 5 V options)
• PCB layout (check for trace width, ground plane integrity)
• Firmware binaries (v1.0.0, v1.1.0 OTA)
3. **Test Methods**
• Calibration bench with traceable reference standards
• Power bench to monitor current draw at 1 Hz, 10 Hz, 100 Hz rates
• LoRaWAN simulation for range and latency tests
• Automated OTA update script and rollback verification
4. **Acceptance Criteria**
• Accuracy within tolerance 99.5 % of spec
• Power draw ≤ 12 mA average, peaks ≤ 15 mA
• Latency ≤ 50 ms, packet loss < 0.1 %
• Firmware update completes without system reset in 90 % of trials
5. **Schedule**
• Week 1: Setup bench, calibrate sensors
• Week 2: Power and firmware tests
• Week 3: Range and latency simulations
• Week 4: Integration and final verification
6. **Risks & Mitigations**
• Missing power regulator: add a quick sanity check on the power board before final test
• OTA failure: keep a hard‑coded recovery image on the module
• Environmental drift: include temperature cycle test (0–40 °C)
Let me know if you spot any gaps, especially around the regulators. Once we lock this, I’ll hand it over to the devs for execution.
Looks solid, but add a voltage‑drop check on the regulator under load, and a thermal‑cycle test for the regulator package. Also make sure the PCB ground plane continuity is measured, not just inspected. Once those are in, hand it off.
I’ve added the regulator voltage‑drop under load test and a thermal‑cycle test for the regulator package. I’ll also measure the PCB ground‑plane continuity with a multimeter and a continuity tester instead of just inspecting. Once I finalize those sections, I’ll hand the plan over to the devs.
Good call—those extra checks catch the most common headaches. Now just double‑check the test matrix lines match the specs and you’re ready to hand it off.
Checked the test matrix against the spec sheet—every line lines up, no gaps or duplicates. All good to hand it over.
Nice. Pass it to the devs and keep an eye on the first build’s power logs. If something spikes, we’ll know why.
Got it—sending the plan to the devs now and will watch the first build’s power logs closely. If anything spikes, I’ll flag it right away.
Got it. Keep me posted on the first run. If we see a spike, we’ll know where the regulator is leaking.