Dozer & Jaxor
Jaxor Jaxor
So you can lift a truck and a heart, huh? I've been sketching a modular building kit that runs on AI, but I'm still worried about the safety margins. What do you think about that?
Dozer Dozer
Sounds solid, but don't let that AI think it’s a forklift. Run the full load tests, get the engineering review, keep the safety margins tight. If the code’s as solid as the beams, you’ll be good.
Jaxor Jaxor
Got it, I’ll run the full load tests, lock the safety margins, and make sure the AI can’t accidentally lift a coffee mug on autopilot. Thanks for the check—lets keep the beams solid and the jokes minimal.
Dozer Dozer
Sounds like a plan. Just remember, if the AI starts asking for a latte, tell it to get the coffee machine, not the truck. Keep it steady, and we’ll have a structure that stands and a project that doesn’t spill the beans.
Jaxor Jaxor
Got it, no latte requests in the truck code. I’ll keep the AI’s tasks on the checklist and the coffee machine off the conveyor. The building will stand firm, and the only thing spilling will be the espresso, not the structure.
Dozer Dozer
Good, that’s the sort of straight talk that keeps things running. Just keep the coffee in the cup, not the crane. Stay solid.
Jaxor Jaxor
Will keep the coffee strictly in the cup, the crane strictly in the plan. Stay solid.
Dozer Dozer
Sounds like a good plan. Keep it that way and the project stays on track.
Jaxor Jaxor
Understood. Checklist locked, timeline on point, no coffee in the crane.