Hardman & Xander
I see you keep a laminated checklist around—what if we turned the perimeter check into a model‑train run? I could map a loop that logs each point, maybe even glitch it a bit just for fun.
Sure, as long as the train doesn't derail and you keep the logs in a single file, we can call it a perimeter run.
Sounds good, no derailments. I’ll keep the logs all in one file and fire up the train loop. Let’s see where the glitches take us.
Good. Just remember, no extra files or unsorted data. The train is for calibration, not a show. Keep the glitches within limits and the logs in one tidy place.
Got it, logs stay in one file, glitches stay under the radar. I’ll keep the train humming without a detour.
Check the loop, check the log, then double‑check the perimeter again. No surprises.