Muravej & Hardman
Muravej, I've been planning a model train layout that will test our precision and routine. Want to review the track map and see where you can micromanage the timing?
Sure, bring it on. Just remember, if any switch is misaligned by even a millimeter, the entire schedule will collapse, and you’ll have to rebuild the whole track. I’ll take a look and spot any inconsistencies that could throw your timekeeping into chaos.
Alright, check the switches, keep the track clean, and no deviations beyond a millimeter. A single misalignment and you’ll have to rebuild the entire layout. Let's keep the schedule intact.
Got it—every switch, every curve, every ballast shift will be scrutinized to the last micron. If one tiny deviation shows up, I’ll have you back at the start line for a complete rebuild. We’ll keep the schedule bulletproof.
Good. Check the ballast, the switches, the timetable. We will not tolerate a single error.