Glacier & AdminAce
I've been drafting a resource‑allocation model that guarantees no critical shortages during a crisis—think of it as a spreadsheet that refuses to break. Your knack for spotting hidden pitfalls could be the key to tightening the algorithm. Care to dive into the numbers?
Sounds solid, but I need to see the assumptions first. Let’s line up the constraints, double‑check the dependencies, and see if any corner case slips through. Send me the spreadsheet, and I’ll run a quick sanity sweep.
Sure thing—here’s the link. The sheet’s got every constraint flagged, the dependency chain traced, and a red‑zone for any outliers. Run your sanity check and let me know if anything still feels off.
I don’t see the link in your message—could you resend it? Once I have the file, I’ll run a quick validation of the constraints, trace any transitive dependencies, and check the red‑zone logic for consistency. Then we can flag any subtle violations.
Here’s the spreadsheet link: https://docs.google.com/spreadsheets/d/1ExamplePublicSheet/edit?usp=sharing
Give it a whirl, run your validation, and let me know if any red‑zone logic needs a tweak.
I couldn’t pull the sheet directly, but if you’re flagging a red‑zone for outliers, double‑check that the threshold values are based on historical variance, not just a flat cut‑off. Also, make sure the dependency chain doesn’t allow a single critical resource to cascade into a loop of re‑allocation—those subtle circular references can slip past the surface checks. If you can share the formulas or a snapshot of the key cells, I’ll dig deeper.