Hey Stoplease, ever thought about how a smart contract could cut down your approval bottlenecks and make the whole team run smoother?
If you think a smart contract can cut bottlenecks, give me a clear demo and a timeline. I need concrete results, not hype.
Sure thing – let’s break it down. Step one: write a tiny Solidity contract that stores an approval request, lets a manager toggle “approved” and emits an event. Step two: deploy it on a testnet (like Goerli) with Hardhat or Remix. Step three: hook the event into a simple front‑end (React + Ethers) that shows pending requests and lets the manager click “Approve”. For timeline: day 1‑2 set up the dev environment, day 3 write the contract, day 4 test and deploy, day 5 build the front‑end and integrate. By day 6 you’ll have a working demo that logs approvals instantly – no more email loops. That’s the concrete plan.
Looks solid enough, but we need to make sure you have a plan for testing, security review, and rollback. No time for a sloppy prototype; if anything goes wrong the whole process stalls. Keep it tight, track every step, and I expect a report by end of day six.
Got it. Here’s the tightened plan:
1. **Day 1–2 – Setup & Contract**
• Spin up Hardhat, configure Goerli.
• Write a minimal, audit‑ready contract with only three functions: submit, approve, cancel.
• Run unit tests (10 % of code coverage) and sanity checks.
2. **Day 3 – Security Layer**
• Pull the contract into a quick internal audit: check for re‑entrancy, overflow, and permission gaps.
• Fix any issues, redo tests, push to a dedicated review branch.
3. **Day 4 – Integration & UI**
• Build a lightweight React page, connect via Ethers, wire up event listeners.
• End‑to‑end test: submit a request, manager approves, UI updates instantly.
4. **Day 5 – Rollback & Fail‑fast**
• Deploy a “fallback” contract that simply logs actions without state changes.
• Set up a script to switch the front‑end to the fallback if the main contract shows errors.
5. **Day 6 – Final QA & Report**
• Run full regression, load test with 100 simulated approvals.
• Compile a concise report: architecture, test results, security findings, rollback steps, and next‑step roadmap.
All steps logged in a shared repo and Jira tickets. By the end of day six you’ll have a verified prototype, a clear rollback plan, and a formal report. Let me know if you need more detail on any part.