Brickman & Ember
Hey Ember, I've been looking at the bridge plans and I think we should lock down those supports before the flood season hits. Want to walk through the details with me?
Absolutely, let’s lock those supports down. They’re the first line of defense against the flood. Where do you want to start? I’ll grab the plans and we’ll go through every detail.
Great, pull up the main structural diagram and line up the foundation bolts. I’ll check the load calculations while you double‑check the alignment markings. Let's keep it tight and efficient.
Pulling up the diagram now. I’ll line those foundation bolts up like a battle plan—no slack. You handle the loads, and I’ll make sure those markings line up perfectly. Let’s finish this before the tide comes in.
Got it. I’ll run the load checks right now. Keep an eye on those bolts, and we’ll seal this before the tide starts.Copy that. I’m crunching the numbers. Keep those bolts tight and we’ll wrap this up before the tide.